Jávea.com | Xàbia.com
Search

Portal de la Marina celebrates its tenth anniversary with a big makeover

May 17 from 2018 - 12: 01

10 years ago since the Portal de la Marina Shopping Center it was installed in our region as a commercial reference. Now, on the occasion of its anniversary, Portal de la Marina completely changes its image by improving access and services. And, once a year, this commercial complex receives more than 4 million visitors.

The renovation of the facilities, as indicated by the director of the shopping center, Carlos Fita, will amount to 3,2 million euros and the works, exterior and interior, will be extended during the next six months. The BroadwayMalyan architecture studio, known for the design of the Miami Cruise Terminal, among others, has been in charge of the project.

The best

One of the changes will be the pedestrian access main to the shopping center, increasing its relevance and visibility. Also, in the main entrance from the center will be installed a portal of 20 meters high, making it more visible and comfortable for visitors.

With regard to the fun of the little ones, a new children's area in the interior of the enclosure, next to the access to the cinemas, and in the outside it will bet by landscaped areas. In addition, all areas of the mall will be redesigned and stylized, along with the redecoration of the accesses to the bathrooms

To redistribute the internal traffic in the complex, the interior access, from the first floor to the second, will be relocated to the central area, giving more space to the terraces and installing three large LED screens, offering a more modern and fun image. In addition, the ramps will be replaced by two escalators. In addition, a panoramic elevator will be installed.

An exciting project

For Carlos Fita, this important investment, which "It will not be small, comfortable or fast", is nothing more than the demonstration of the clear and definitive commitment of the Lar Group for this project, and by extension, for the Marina Alta.

The director of the shopping center explained that the work will be carried out at night so as not to hinder the opening hours of the center, and will be carried out in two phases: the first, until the month of July, when they will be interrupted to attend the great influx of visitors own the summer in this area. In the month of September they will be resumed and it is expected that they will be finalized for the Christmas campaign.

The mayor of Ondara, José Ramiro, has expressed his satisfaction for the large investment that will be made in the municipality, which will mean an important visibility for the Marina Alta.

Braulio, the "head of works"

In order to make these works more bearable, the one in charge of reporting on the progress of the same will be Braulio, the fictitious works manager of Portal de la Marina. This character, embodied by the Valencian actor Berna Llobell, will be in charge of informing, through social networks, the progress of the works. In addition, you can resolve the doubts of customers about this matter.

Contact Portal de la Marina

Leave a comment

    28.803
    0
    9.411
    1.030